Plumbing
Showing 1–9 of 22 results
-

Bathroom Plumbing Renovation
Select date(s) -

Concealed Pipe Leakage Repair
Select date(s) -

Floor Drain Blockage
150.00AED Select date(s) -

Full Bathroom Plumbing Work
Select date(s) -

Main Drain Blockage
220.00AED Select date(s) -

Minor water leakage repair
130.00AED Select date(s) -

Pipe Leakage Repair, Visible Pipe
100.00AED Select date(s) -

Plumbing Inspection / Diagnosis
50.00AED Select date(s) -

Shower Mixer Replacement
150.00AED Select date(s)